Planning of remediation measures is in progress.

Altlast ST28 "Gaswerk Jakomini" (Styria) click to enlarge


.
. .
Subject of Project:

On this site, town gas was produced in the period between 1845 and 1945. At the end of World War Two, the plant was almost completely destroyed by bomb attacks and was not reconstructed thereafter. Currently, a tram remise, the main workshop for trams, as well as several administrative buildings are situated on the area.
The subsoil in the eastern part of the area is partly contaminated with tar and tar oil, whereby tar has locally spread down to the aquiclude in a depth of approx. 20 m. Starting from the subsoil pollution, a contaminant input into the groundwater can be observed.

Assignments of BALSA:
  • Complete realisation and carrying out of remediation measures:
    • conceptual planning / project-filing / detailed planning
    • planning and management of detailed exploration
    • planning of remediation measures
    • carrying out of tendering and award procedures
    • all agenda of project-management and project-steering

.
.
.
. . .

.